Construction Gone Bad in Vernon

Men have been digging at the hill to make a level place to build houses, and have put up a wall of blasted rock to hold the hill back. Note the deer.

In the two months since this wall was constructed, it has rained, oh, 0.5 millimetres once. It was enough to barely wet the soil.

But still it flowed.

And flowed!

Imagine what 2 mm. would do!

Imagine 1 cm.!

What were they thinking?

Were they thinking?

It sure doesn’t look like it.

It will be the city’s problem some day.

Someday soon.

How embarrassing.

As for the deer, she has been doing a little erosion of her own.

Her angles are precise. Note how she has loosed a little avalanche on the left.The rain ought to make good use of that when it comes.

There should be laws against this kind of stupidity and carelessness.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s